EMETER-20 SMA Bidirectional Energy Meter | MR WATT
zoom_out_map
chevron_left chevron_right

EMETER-20 SMA Bidirectional Energy Meter

SMA Energy Meter EMETER-20: bidirectional three-phase meter (also usable on single-phase) with direct connection up to 63 A per phase, higher with external transformers. Measures import, export and production with 1% accuracy and a 1-second cycle, sending data via Ethernet to SMA systems.

DIN rail, 4 modules, 70 x 88 x 65 mm, 0.3 kg, IP2X, self-consumption below 3 W, 2-year warranty.

€377.45 Tax escl.

The SMA Energy Meter EMETER-20 measures, phase by phase and in both directions, the energy exchanged with the grid at the connection point. It sends the values over the local network via Ethernet to SMA devices, which use them to manage self-consumption, battery charging and discharging and export limitation. It can also measure the production of PV inverters from other brands.

Direct connection: the phase conductors run through the meter

This is the difference from the CT version. In the EMETER-20 the phase conductors go straight into the meter terminals, up to 63 A per phase: no current transformers are needed, so there is no CT direction to respect and no sign errors from a CT mounted the wrong way. In exchange you need adequate space and wiring: the meter takes up 4 DIN modules and, with 63 A fusing, requires conductors of 10 to 16 mm². In a full household distribution board, check beforehand that it fits. For currents above 63 A, external current transformers are connected.

EMETER-20 technical specifications

MeasurementThree-phase bidirectional, also usable on single-phase
Nominal / limiting current per phase5 A / 63 A (higher with external current transformers)
Nominal voltage / frequency230 / 400 V, 50 / 60 Hz (±5%)
Start-up currentBelow 25 mA
Accuracy / measuring cycle1% / 1000 ms
Connection cross-section10-16 mm² for 63 A fusing (mechanical 1.5-25 mm²), torque 2.0 Nm
CommunicationEthernet 10/100 Mbit/s, RJ45, to the local router
Operating temperature-25 to +40 °C
ProtectionIP2X, insulation class II
MountingDIN rail, 4 modules, in distribution board or meter cabinet
Dimensions and weight70 x 88 x 65 mm, 0.3 kg
Self-consumptionBelow 3 W
Status display2 LEDs
Warranty2 years

When you need it and when you don't

You need it on any SMA system that must know the grid exchange: with a battery, with export limitation or zero export, or when you want to see household consumption in Sunny Portal. You do not need it if you install the Sunny Home Manager 2.0, which already has a built-in meter up to 63 A: in that case the EMETER-20 is only added to measure an additional point of the system or the production of another brand's inverter. Clarify this at quotation stage so you don't buy the same measurement twice.

EMETER-20 or Energy Meter CT

The choice depends on the board. The direct-connection EMETER-20 is simpler to commission and has no risk of reversed CTs, but it takes 4 modules and the power cables must pass through it. The CT versions, such as the EM-3CT63A-21, take 2 modules and are installed without cutting the conductors, which is handy when working on an existing board. Consider the environment too: the EMETER-20 operates up to 40 °C, so in a sun-exposed or crowded board keep an eye on the internal temperature.

Frequently asked questions

Does it replace the utility meter?

No. The billing meter remains the utility's. The EMETER-20 is a management measurement installed downstream, which the SMA system uses to control the inverter and battery.

Can it be used on a single-phase system?

Yes, the meter is three-phase but is declared suitable for single-phase systems too.

Does it work with non-SMA inverters?

It can measure the production of other brands' inverters and make it available to SMA systems, for example for self-consumption calculation. Active system management, i.e. battery charging and export limitation, remains designed for SMA devices.

Does it need Wi-Fi?

No, and it has none: the connection is via Ethernet cable to the router or switch that the inverter and energy manager are connected to. Plan a network cable to the distribution board.

What happens above 63 A per phase?

The meter stays the same, but measurement must be done with external current transformers. A household supply rarely gets there: a 15 kW three-phase connection draws about 22 A per phase.

SMA
b1a8fb0a-5b11-11eb-b7ef-0242ac110002
100 Items