SMA EM-3CT63A-21 Three-Phase CT Meter 3x63 A | MR WATT
zoom_out_map
chevron_left chevron_right

EM-3CT63A-21 SMA CT Energy Meter 3x63 A

The SMA Energy Meter CT EM-3CT63A-21 provides bidirectional measurement of the energy exchanged with the grid on a three-phase system, using 3 included current transformers up to 63 A per phase. It mounts on a DIN rail (2 modules) and sends data via Ethernet to compatible SMA systems for self-consumption, battery management and export limitation.

€220.28 Tax escl.

The SMA Energy Meter CT EM-3CT63A-21 is the meter that tells the SMA system how much energy is coming in from the grid and how much is going out, phase by phase. On a three-phase system it measures current through three 63 A current transformers (CTs), included in the box, and transmits the values over the local network via Ethernet. All energy management functions rely on this measurement: self-consumption, battery charging and discharging, export power limitation.

Why a system with storage needs a meter

An inverter only sees what it produces. To decide whether to charge the battery, discharge it or reduce production, it needs to know what is happening at the grid connection point: whether the house is drawing power or exporting surplus. Without a bidirectional meter installed downstream of the utility meter:

  • the battery does not know when to cover household consumption;
  • no export limit or zero export can be applied;
  • the monitoring portal shows production but not consumption and grid exchange.

SMA Energy Meter CT EM-3CT63A-21 technical specifications

Measurement typeThree-phase, indirect via current transformers
Transformers included3 CTs
Maximum current63 A per phase
Measured quantitiesGrid import, export and production, bidirectional
Measurement accuracy2% or better
Rated voltage85-250 V AC, 50/60 Hz
Self-consumption2 W or less
CommunicationEthernet (SMA Speedwire) to SMA systems on the local network
MountingDIN rail, 2 modules, in the distribution board
Operating temperature-25 to +55 °C
ProtectionIP20, insulation class II, overvoltage category III
Dimensions and weight88 x 35 x 65 mm, 0.3 kg
Warranty2 years SMA

Measuring with CTs: how it is installed

With the CT version the phase conductors do not pass through the meter: they run through the three current transformers, while the meter itself takes up only 2 DIN modules in the board and picks up the phase voltages. The CTs must be installed immediately downstream of the utility meter, before any branch circuit, respecting the indicated direction: a CT mounted the wrong way swaps import and export and corrupts the entire energy management. The network cable goes to the router or switch that the inverter and energy manager are connected to.

Compatibility

The EM-3CT63A-21 communicates with SMA systems on the local network, including the Sunny Home Manager 2.0 and Sunny Tripower inverters with energy management functions; data is visible in Sunny Portal and the SMA Energy App. Check compatibility with your inverter or energy manager model in the SMA documentation before buying.

Frequently asked questions

Does the Energy Meter CT replace the utility meter?

No. The billing meter remains the one installed by the utility. The Energy Meter CT is a management measurement: it lets the SMA system know how much energy is imported or exported and adjust the inverter and battery accordingly.

Is 63 A per phase enough for my installation?

For homes and small three-phase businesses, yes: a 15 kW three-phase supply draws about 22 A per phase, well below the limit. For currents above 63 A per phase a different metering solution is needed.

Is it needed for zero export?

Yes. To limit or cancel the power exported to the grid, the inverter must know the exchange at the connection point in real time, which is exactly what the Energy Meter measures.

Can I use it on a single-phase system?

This version is three-phase with three CTs. For single-phase systems there is the SMA Energy Meter CT variant with a single transformer, EM-1CT63A-21.

What happens if I mount a CT the wrong way round?

That phase is read with the opposite sign: import appears as export and vice versa, and the battery or power limitation work on wrong data. Check the direction marked on the transformer during installation and verify the readings on the portal at commissioning.

SMA
caaf6aba-bf82-11ea-8d74-42010a9c0053
100 Items