Kit micro-fotovoltaico con inverter 1 kW conforme CEI0-21
1kW Plug and Play solar kit with ZCS Azzurro 1000W inverter (CEI 0-21 compliant), solar panels (max 800Wp), 10m red and black solar cables and MC4 connectors. Simply connect the panels to the inverter and the inverter to a 230V household socket to start producing solar energy and reducing grid consumption. Simplified grid notification procedure applies.
Kit includes: solar panels max 800Wp · ZCS Azzurro 1kW inverter (CEI 0-21) · 10m red + 10m black cable · MC4 connectors.
The 1kW ZCS Azzurro Plug and Play solar kit is a complete solution for producing solar energy and reducing grid consumption through a simplified connection. The ZCS (Zucchetti Centro Sistemi) Azzurro 1000W inverter is CEI 0-21 compliant with a minimum MPPT voltage of 50V, and connects directly to the household socket — injecting solar energy into the domestic circuit without structural modifications or complex authorisations.
How the 1kW Plug and Play kit works
Solar panels capture sunlight and convert it to DC power. The ZCS Azzurro inverter converts it to 230V AC and injects it directly into the domestic circuit. Every watt produced is consumed before drawing from the public grid, reducing consumption and lowering electricity bills. Thanks to panel power below 800Wp and CEI 0-21 compliance, the simplified single notification procedure to the local grid operator applies.
Technical specifications — Kit KIT1KWCEI
| Panel power | Maximum 800 Wp |
| Inverter | ZCS Azzurro 1000W (CEI 0-21 compliant) |
| Min. MPPT voltage | 50V |
| Cables | 10m red + 10m black solar cable |
| Connectors | MC4 included |
| Battery | Not included |
Frequently asked questions
Do I need an electrician to install this kit?
While the kit is designed for simplified installation — connecting panels to the inverter and the inverter in parallel to the 230V household circuit — it is always advisable to involve a qualified electrician to ensure electrical safety, proper earthing and regulatory compliance. The CEI 0-21 compliant inverter includes automatic anti-islanding protection, disconnecting from the grid during power outages.
What grid notifications are required?
Thanks to CEI 0-21 compliance and panel power below 800Wp, only the simplified single notification to the local grid operator (ENEL Distribuzione or equivalent DSO) is required. No building permit, GSE registration or Gaudì procedure is needed for this category of system. For systems between 351W and 800W AC output, a Declaration of Conformity is also required.
How much energy will this kit produce per year?
An 800Wp system produces approximately: Northern Italy 700–950 kWh/year, Central Italy 950–1,100 kWh/year, Southern Italy and Islands 1,100–1,300 kWh/year. For other European locations, the PVGIS tool (free EU Commission simulator) provides precise estimates. At an average energy cost of around €0.37/kWh, estimated annual savings range from €260 to €480 depending on location and self-consumption.
What does CEI 0-21 compliance mean?
CEI 0-21 is the mandatory Italian technical standard for connecting generation systems to the low-voltage distribution grid. Compliance ensures the inverter meets all grid protection requirements, including automatic anti-islanding disconnection during power outages — protecting both grid operators and maintenance personnel. It is a legal requirement for all grid-connected systems in Italy.
📦 Shipping information for international customers